| Miscellaneous Discussions Off Topic (OT) items that really don't fit into any other Category |
![]() |
|
|
Thread Tools | Display Modes |
|
#131
|
||||
|
||||
|
If valves don't need valve clearance , it is the most considerable problem desmodrom will disappear .
Perhaps therefore it is possible to come back to old good desmodrom Happy New Year, for all Friends. Regards Andrew |
|
#132
|
||||
|
||||
|
"Salt water extraction"
![]() http://www.new4stroke.com/pompa.pdf And sallt water Tank: ![]() 1 m^3 / sec if H = 100 m give ~~ 1 MW ( 1000 KW) electric energy Regards Andrew |
|
#133
|
||||
|
||||
|
Quote:
You must first prepare a specially made item to seal the leak. It must have a large size that is 60 feet tall and 60 feet in diameter at its widest point. at the bottom of this item, please place a special knife around the bottom edge. Knife must of course be made of very hard material, such that will be able to cut all the metal parts that will be on its way In his way will certainly be a lot of old items damaged hole. Of course, that this knife can cut through all the elements needed to operate a very large force. And here once it wisely: So, yes, prepared some of the new valves (of course, completely open for the moment) should leave the head in the fire, so was in the middle of that item, the item with the valves can say, weighing about 100 tons. This does not allow the weight placed on its bottom remains the old structure with a knife. But this element has a conical tank shown in the figure, which is thrown from the vessel through a pipe can fill it with concrete or specific, or a ball of iron. Its dimensions are 60 feet in diameter and 30 height. The size of this "cone" will be about 3,000 cubic meters (m ^ 3). If you will fill it, for example, iron is its weight increased to approximately 21,000 tonnes. feel that this burden is not cheap, it was a knife to cut all the metal parts that are on the road. Ellement pockets certainly say that the bottom about 20 feet. It will seal. The next step will be to close the new valve at the top of the item. Later, these valves will work even with the new pipe attached. I think that despite the high oil pressure is also created so much of the burden will be able to seal the damaged head. ![]() I totally do not know to whom to send my solution. So please read his message, where there is a chance that will go into the right hands. Maybe it will help you seal the leak. Regards Andrew Feliks Last edited by Feliks; 05-30-2010 at 05:18 AM. |
|
#134
|
||||
|
||||
|
Further refinement:
Through small holes in the bottom of the cone, the possible leakage logic accumulate in the reservoir at the bottom, where an additional procedure of evacuated tube to the platform. ![]() ![]() Regards Andrew |
|
#135
|
||||
|
||||
|
And that little bit more help with entering into the seabed:
Dawson Double Acting Hydraulic Impact Hammers ![]() Regards Andrew |
|
#136
|
||||
|
||||
|
Drive for pump or oscillating dynamo:
![]() Will it be possible the new World Energy Policy in line with this map ?? http://www.new4stroke.com/Heightwave.PDF Regards Andrew |
|
#137
|
|||
|
|||
|
^^^^^that's Heavy
Cowabunga! |
|
#138
|
||||
|
||||
|
Well, who would have thought that Newcomen was so close to an adequate solution
![]() ![]() Regards Andrew |
|
#139
|
||||
|
||||
|
Beautiful simple new 4 stroke kinematics animation made at the
King Soud University. ![]() And a little faster ![]() Regards Andrew |
|
#140
|
||||
|
||||
|
Quote:
![]() Regards Andrew |