This never came up the first time the thread started.... is it possible or OK to do half the floor and then do half the floor later? I don't care about the seam in the middle of the floor where the two halves should meet, just that I have a lot of stuff (tools and other whatnot) I would rather not leave in the driveway for a week. I'd rather shift it all from side to side rather than take it all out and find another place for it.
And does it really take a week

to cure?
Maybe one of those on-site PODS is my solution....