![]() |
Project Update: Road Report
Just had to share my joy with the board: almost 3 months to the day we dropped the engine I was finally able to hit the road and reap the benefits of my project.
After 125 miles today I am glad to report that everything is nice and tight with no oil leaks and the new clutch set-up is a 1000% percent improvement! It was a great feeling to be back behind the wheel with the sound of that glorious flat six behind me (minus the engine sound pad now :) ) I hope to get in at least another 150 miles tomorrow and then I'll be well on my way to shaking the car down for the March DE. Thanks again to everyone on the board who helped ... I thought of you today as I was racking up the miles :D |
Great news!
|
Well done! I can't wait to join you.
|
Good work is it's own reward!
If you are out and about stop by the Taj today. Bill and I will be out in the shop until about 2:30. packing the Yellow Fellow up for the paint shop. |
Great job! Glad your back on the road and dripless!
Kurt, details on the paint job. I'm still looking for the "right" place. |
Doug, congrats on a job well done.
No oil leaks, are you sure you put back a Porsche motor? :wink: Have fun! |
Re: Project Update: Road Report
Quote:
|
Paint job = Maaco. It's a track car. 10 foot spray is all you need and if you do a good paint job you will just piss off the tire wall gods. :shock:
It went out yesterday. Sure was easy to push up on the trailer! :twisted: Pix upon its return. |
Quote:
|
| All times are GMT -4. The time now is 01:05 AM. |
Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.